Fred Meyer added 12 Starbucks to its stores with the help of Portland Mechanical Contractors and RJC Construction. The highlighted project in Spokane, WA, consisted of installing the necessary water piping, waste piping, concrete cutting, and the design and installation of grease traps. Fred Meyer consistently trusts us with their projects as we customize our strategic planning to fit their specific needs. Starbucks has a high standard of quality: They provide a pre-fabricated kiosk in which our team then positions the piping and necessary mechanical work to efficiently adapt to their installed kiosk. Starbucks requested the Spokane project to be completed within 10 days, and our team enthusiastically met their timeline. We worked directly with the store to ensure that customers were not impacted, and we minimized our impact on daily store operations.
Although this project was not large, we commit to the same level of quality no matter the size of project.